Company Cost Setup

Company-level

Estimating defaults applied across all projects. Required before final calculations and report export.

Show:
1.Labor Rates
ClassificationBase RateFringeTotal /hrSourceActions
Operator — Group 3$55.10$34.75
$89.85
Manual
Laborer — Group 1$41.70$28.40
$70.10Project override — #24-118
Manual
Teamster — Driver$42.85$30.15
$73.00
Manual
Cement MasonRate missing
Prevailing wage database sync — Coming soon
2.Equipment Rates
EquipmentRateUnitOwned/RentalSourceActions
Asphalt Paver
$185.00
/hrOwnedManual
Vibratory Roller (10-ton)
$95.00
/hrOwnedManual
Excavator (CAT 330)
$145.00
/hrRentalManual
Loader (966)
$118.00
/hrOwnedManual
Water Truck (4,000 gal)/hrRentalRate missing
Equipment rental rate feed — Coming soon
3.Markups & Margins
8.0%
5.0%
10.0%

Currently applied to the Shasta County estimate

1.2%

of contract value

Required

4.Taxes

Labor and equipment are not taxed in CA

5.Indirects & Mobilization Defaults

of subtotal · Overridable per project

of labor

6.Crew & Production Defaults
Paving Crew1 Operator, 6 Laborers, 1 Teamster
Pipe Crew2 Operators, 4 Laborers
ActivityProduction RateSource
HMA Paving485 TON/dayManual
RCP Install120 LF/dayManual
Labor production databaseComing soonComing soon
Labor production databaseComing soonComing soon