Prototype Demo · Sample data only · No real AI processing
Project Intelligence
AI analyzedShasta County Roadway Improvements · #24-118
42 days to bid
Project Summary
Roadway rehabilitation of approximately 2.1 miles of Deschutes Road including cold planing, HMA overlay, localized dig-outs, drainage improvements (640 LF of 18-inch RCP and 12 new inlets), curb & gutter replacement, thermoplastic striping, and signage. Work is within Shasta County right-of-way with lane closures permitted 8:30 AM–4:00 PM. Prevailing wage applies. 60 working days. One addendum issued (revised HMA quantity and bid date).
Key Facts
Working Days60
Liquidated Damages$2,500/day
Bid Bond10%
Payment/Performance Bonds100%
DBE GoalNone stated
Prevailing WageYes (CA DIR)
Pre-Bid MeetingAug 6, 2026 10:00 AM (non-mandatory)
Critical Dates
Pre-bidAug 6
→RFI cutoffAug 12
→Addendum acknowledgment—
→Bid DayAug 22 · 2:00 PM
Major Scope Items
- Cold plane 2" — 12,300 SY
- HMA Type A overlay — 4,850 TON
- Roadway excavation — 8,450 CY
- 18" RCP storm drain — 640 LF, 12 inlets
- Curb & gutter replacement — 2,150 LF
- Thermoplastic striping — 24,500 LF
- Signage — 14 signs
- Hydroseed erosion control — 45,000 SF
Addendum Impact
Addendum 01 (Jul 28): HMA quantity revised 4,600 → 4,850 TON; bid date moved from Aug 15 to Aug 22.
Missing Information
Consider an RFI.
We could not locate: soil disposal site designation; utility potholing responsibility.